General information about the project
Customer: “Agency for Territorial Rehabilitation of the Republic of Azerbaijan”
Designer: “Ay Consulting” LLC
Contractor: Akkord Industrial Construction Investment Corporation
Type of contract: “Construction Contract”
Contract value: USD 54,891,682.00
Financing bank: “Azerbaijan State Budget”
Construction start date: 2011
Completion date of construction: 2015
Construction period: 48 months
Number of home speeches: 6569 units
Length of water network: 96 km
Length of sewerage network: 101 km
Sewage wells: 2892 units
Artesian wells: 7 units
Depth of artesian wells: 840 m
Reservoirs: 2x5000 m³
Water pumps: 1 unit - 420 m³ / h
CSTQ: - 1 unit x 6000 m³ / day
Description of the project
7 subartesian wells were drilled for the drinking water supply of Tovuz city, 2 water reservoirs with a capacity of 2500 m³ and 2 water reservoirs with a capacity of 200 m³ were built, a water network with a length of 232377.3 m, and a sewerage network with 213316.4 m were laid. A Wastewater Treatment Plant with a capacity of 6400 m³ / day, an administrative building, a laboratory building, and other ancillary buildings was built and put into operation. As a result of this project, 43,000 people will be provided with drinking water 24 hours a day.