Reconstruction of Water and Sewerage Works in Tovuz City

General information about the project

Customer: “Agency for Territorial Rehabilitation of the Republic of Azerbaijan”

Designer: “Ay Consulting” LLC

Contractor: Akkord Industrial Construction Investment Corporation

Type of contract: “Construction Contract”

Contract value: USD 54,891,682.00

Financing bank: “Azerbaijan State Budget”

Construction start date: 2011

Completion date of construction: 2015

Construction period: 48 months

Number of home speeches: 6569 units

Length of water network: 96 km

Length of sewerage network: 101 km

Sewage wells: 2892 units

Artesian wells: 7 units

Depth of artesian wells: 840 m

Reservoirs: 2x5000 m³

Water pumps: 1 unit - 420 m³ / h

CSTQ: - 1 unit x 6000 m³ / day

Description of the project

7 subartesian wells were drilled for the drinking water supply of Tovuz city, 2 water reservoirs with a capacity of 2500 m³ and 2 water reservoirs with a capacity of 200 m³ were built, a water network with a length of 232377.3 m, and a sewerage network with 213316.4 m were laid. A Wastewater Treatment Plant with a capacity of 6400 m³ / day, an administrative building, a laboratory building, and other ancillary buildings was built and put into operation. As a result of this project, 43,000 people will be provided with drinking water 24 hours a day.

Projects

  • Pipeline
  • Completed

Reconstruction of Water and Sewerage Works in Agstafa

  • Pipeline
  • Completed

The Trans-Anatolian Natural Gas Pipeline (TANAP)

All rights reserved © 2005-2021.